WordPress database error: [Got error 28 from storage engine]SHOW FULL COLUMNS FROM `wp_options`
WordPress database error: [Got error 28 from storage engine]SELECT t.*, tt.* FROM wp_terms AS t INNER JOIN wp_term_taxonomy AS tt ON tt.term_id = t.term_id INNER JOIN wp_term_relationships AS tr ON tr.term_taxonomy_id = tt.term_taxonomy_id WHERE tt.taxonomy IN ('post_tag') AND tr.object_id IN (1299) ORDER BY t.name ASC
WordPress database error: [Got error 28 from storage engine]SELECT t.*, tt.* FROM wp_terms AS t INNER JOIN wp_term_taxonomy AS tt ON tt.term_id = t.term_id INNER JOIN wp_term_relationships AS tr ON tr.term_taxonomy_id = tt.term_taxonomy_id WHERE tt.taxonomy IN ('category') AND tr.object_id IN (1299) ORDER BY t.name ASC
US Castings was awarded a Government contract for the production of replacement drain grates for the tunnels of a major metropolitan subway system. The first article inspection was completed within only a few weeks of the contract award, and the production order delivered on-time.
This job was coordinated through one of US Castings’ global partner foundries, and the Operations Department worked closely with one of our 3PL logistics partners to deliver the products to the customer’s location without any delays.
Quality Control/Quality Assurance documentation was supplied to the customer prior to the first article and production shipments, assuring the customer that the parts were in conformance.